For high voltage field service crews.

You know the job. Wye keeps up with the paperwork while you do it.

Wye is Amalgamind built for transformer field service: installs, moves, oil processing, testing. Every job runs through a desk for each step: the site walk, quoting, safety, operations. Your people talk the job through at each one, and Wye writes it down.

How a job runs

  1. The job comes in. Whoever walked the site talks through what they saw: the unit, the pad, the access, what's energized nearby. Wye writes the scope sheet, builds the price worksheet from your own rates, and lists what nobody knows yet. You set the price.
  2. The safety analysis. Wye drafts the job hazard analysis from the scope and your own safety tables: the steps, the energies, the clearances, tank entry, when work stops. It's a hold point. Nothing moves to the field until a person who knows the work reads it and marks it final.
  3. The field work. The crew talks at the truck, and the record gets written for them. Changes, surprises, the crane that showed up a size too small. No forms.
  4. The close-out. Wye reads the job's final report and what's still open, lists every check and sign-off it still needs, and drafts the close-out package for your customer. Nothing goes to the customer until a person approves it and sends it.

One job, walked through

This is an invented example. Willow Flats Substation is made up, and so is the job.

A 72 MVA transformer goes in at Willow Flats. The site walk says there's an energized 115 kV bus about 25 feet east of the pad, and the west pad "looks firm."

At the quoting desk, the owner asks what the price is built on. Wye breaks it down by crew and days, then lists what isn't counted yet: the general foreman's standing time, the safety lead's time, idle equipment days, travel, lab fees. The owner sets the price.

At the safety desk there's no hazard analysis yet, so Wye drafts one from the scope and the company's own tables. Then the owner fills the gaps by talking. The heaviest pick is the conservator, about 8,000 pounds, planned at 10,000. The longest reach is about 40 feet, planned at 45. The crane sets up west, away from the bus, and is sized for the worst case. When the numbers he said didn't add up, Wye asked before writing anything down. When rescue was "there within 24 hours," Wye asked again, because a tank entry needs rescue standing by on site. It is.

The analysis is marked final by the owner. The hold point still waits on the lift plan and the heat plan, and Wye says so. It also flags that nobody staffed the night shift for vacuum and oil processing, which changes the price.

All of it was done by talking.

Where Wye is today

Built and running. We're looking for the first field service company to run real jobs on it with us.